Product OverviewThe PERI UP Flex Bracing Scaffold is designed for daily site activities such as reinforcement, formwork and concreting. The prefabricated scaffold units provide practical access to the formwork and deliver high stability without ballast or anchors.
DetailsThe Bracing Scaffold is available with basic widths of 150 cm or 250 cm and in configurations of up to three fields lengthwise. Large units can be lifted by crane thanks to the tension-proof connections. High safety in the working areas increases on-site productivity.
Key benefits- Simple to plan: Fast determination of material requirements using prefabricated units.
- Suitable for large units: The Bracing Scaffold can be moved by crane with standard shafts.
- Safe erection: The advance guardrail ensures safe assembly.
- No ballast or anchors required: Extremely stable without ballast or anchors.
ApplicationsDesigned as a reinforcement framework for working directly at formwork and walls, for reinforcement, formwork and concreting tasks on site.
Caractéristiques / spécifications techniques- Scaffold type: Reinforcement Framework
- Dimensions: Standing height: Up to 10.80 m; Total lengths: Up to a maximum of 9 m
- Type of use: Working scaffold up to load class 3 (200 kg/m²)
- Width class: SW 03, SW 06, SW 09, SW 12, SW 15
- Load class: LK 1, LK 2, LK 3, LK 4, LK 5, LK 6
- Design width: 75 cm, 100 cm
- Body heights: Up to 10.80 meters
- Scaffolding grid: Metric
- Type of pavement: Steel
- Structure principle: Advance assembly in the system according to TRBS 2121-1 possible
- Body length: 1 field, 2 fields, 3 fields
- Field length: 150 cm, 200 cm, 250 cm, 300 cm
- Base width: 150 cm, 200 cm
- Compatible with: PERI UP scaffolding kit