ProblemBuild-ups in the preheating tower at the kiln inlet, smoke box, riser duct and bypass required around 8 hours of cleaning per day using high-pressure and Cardox methods.
ObjectiveEliminate concretion that disrupts the industrial process and reduces production capacity, enabling safer and more continuous kiln operation.
SolutionInstallation of 85 AIRCHOC® DN150 air cannons with remote solenoid valves and 2 MACSYS control units to automate and target impact zones.
Result- No more build-up in the treated zones
- Increased use of alternative fuels due to improved flow and reduced risk of blockages
- Rapid return on investment and significantly reduced manual cleaning time
Technical characteristics / specifications- Manufacturer: Standard Industrie
- Product family: AIRCHOC® air blasters (air cannons)
- Quantity installed: 85 units (DN150)
- Accessories: remote solenoid valves
- Additional equipment: 2 MACSYS control/management units
- Application areas: kiln inlet, smoke box, riser duct, bypass (preheating tower)
- Previous cleaning effort: ~8 hours/day using high-pressure and Cardox
- Processed material: powder (pre-clinker and cement)
- Observed benefits: elimination of build-ups, increased alternative fuel usage, reduced cleaning time, rapid ROI
- Case study publication: 21 November 2022