Dielectric tester HZKZ-50A
power lossfor transformersindustrial

Dielectric tester - HZKZ-50A - Huazheng Electric - power loss / for transformers / industrial
Dielectric tester - HZKZ-50A - Huazheng Electric - power loss / for transformers / industrial
Dielectric tester - HZKZ-50A - Huazheng Electric - power loss / for transformers / industrial - image - 2
Dielectric tester - HZKZ-50A - Huazheng Electric - power loss / for transformers / industrial - image - 3
Dielectric tester - HZKZ-50A - Huazheng Electric - power loss / for transformers / industrial - image - 4
Dielectric tester - HZKZ-50A - Huazheng Electric - power loss / for transformers / industrial - image - 5
Add to favorites
Compare this product

Characteristics

Test type
dielectric, power loss
Tested product
for transformers
Applications
industrial, for power systems
Configuration
handheld
Other characteristics
digital, automatic, rugged

Description

HZKZ-50A Transformer On-No Load Characteristics Analyzer is the latest product of Huazheng Electric Manufacturing (Baoding) Co., Ltd. The instrument adopts the popular ARM processor in this year, with 168M basic frequency and 128m memory, which can be expanded to 4G memory card. Using 7-inch high-definition color touch panel, combined with emwin display interface so as to make the instrument interface being friendly and operated in a simple way, it can be operated through the touchscreen without keyboard. The instrument support database and can be exported through USB disk or transmitted to computer via data wire. Introduction The circuit design of this instrument is exquisite and unique, which makes it superior in performance, powerful in function, small in size and light in weight. It can not only be used to test the on-no load parameters of transformer, but also measure the harmonic content and waveform in the field. The instrument can record the test curve of transformer under on-no load condition, then provide reliable basis for transformer fault analysis. Wiring And Attention 1. When using the instrument, please follow the instructions to wire and operate. 2. The earthing terminal or grounding terminal of power wire should be reliably grounded nearby.

VIDEO

Exhibitions

Meet this supplier at the following exhibition(s):

Middle East Energy
Middle East Energy

1-03 Sep 2026 Dubai (United Arab Emirates) Hall H1 - Stand B25

  • More information
    Enlit Asia
    Enlit Asia

    22-24 Sep 2026 Jakarta (Indonesia) Stand 1141

  • More information

    Other Huazheng Electric products

    Transformer Test Equipment

    *Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.